Evaporative cooler Spring start up service:
- We will reinstall the drain in your cooler and flush any debris that has accumulated in it over the winter.
- We will reconnect the water line and check for leaks.
- We will remove your cover or block off plates.
- We will reinstall and check adjustment of the belt.
- We will check or adjust the water level in your cooler.
- We will start up the cooler and check for proper operation.
Important: Service is strictly limited to our previous installation customers on a first come/first serve basis.